Use Prepare early for readiness validation, and schedule Migrate for the planned outage window.
The “Prepare” step is non-disruptive and can be run ahead of the scheduled migration window.
- It performs validation and pre-checks, and prepares required resources for the Standard Public IP deployment.
- It may surface prerequisites or issues that must be resolved before migration.
- It does not change the gateway’s active configuration or impact traffic flow.
When to run it:
- Run Prepare in advance (days before, if needed) to identify and fix any issues early.
- Perform the actual “Migrate” step during a maintenance window, as that step introduces downtime. The “Prepare” step is non-disruptive and can be run ahead of the scheduled migration window.
- It performs validation and pre-checks, and prepares required resources for the Standard Public IP deployment.
- It may surface prerequisites or issues that must be resolved before migration.
- It does not change the gateway’s active configuration or impact traffic flow.
- Run Prepare in advance (days before, if needed) to identify and fix any issues early.
- Perform the actual “Migrate” step during a maintenance window, as that step introduces downtime.